Metals Removal at theĀ Kensington Mine
This project required trouble-shooting and optimizing operations at the mine water treatment plant, which has a capacity of 1500 gpm. Tasks included visiting the site, developing operating guidelines, writing an Operations and Maintenance Manual, optimizing metals removal, assisting with sewage treatment plant and potable water treatment plant operations, designing upgrades for an increased capacity of 2500 gpm, and designing a nitrogen removal system.